← Back to projects

Industrial

4,200 m² steel-framed industrial building

Portal frame spanning 30 m with a 10 t overhead crane.

Full design of the steel structure of an industrial building with an overhead crane, including foundations, base plates and bolted connections resolved with shop drawings.

Steel tonnage was optimised by 12 % against the initial layout through section tuning and the use of Class 4 sections checked with the effective width method.

Other projects